Linn County Juvenile Courthouse Site Design
Design Dynamics
Problem
The Linn County REC needed to upgrade several electrical substations.
Solution
Brain Engineering was retained to provide the surveying and engineering for the site of several of the substations. To complete the job, we identified and addressed several necessary steps. A conditional use was required by the Linn County Planning and Zoning, which required a site plan. As a part of the site plan, a grading plan need to be developed along with detention requirements.
Finished Project
The Linn County REC is currently in the process of upgrading their sites according to our developed site plan.